Coating Process Infographic

An infographic of the coating process should show what information is needed and what checks are performed at each stage. The workflow table below outlines the general sequence of an industrial coating job. The processing sequence and inspection scope are specified in detail according to the substrate and coating system.
Workflow from part to finished surface
| Stage | Purpose | Before moving to the next stage |
|---|---|---|
| 1. Part identification and acceptance | Define the equipment to be processed and the request | Evaluate material, dimensions, existing surface and damage |
| 2. Process planning | Determine the appropriate system and processing scope | Clarify service conditions and acceptance criteria |
| 3. Surface preparation | Establish the specified surface condition for coating | Check preparation against the applicable instructions |
| 4. Coating application | Apply the specified layer structure | Track the product code and application records |
| 5. Specified processing conditions | Enable the system to achieve its required properties | Required drying or heat-treatment records |
| 6. Final inspection and delivery | Evaluate the part against the specified requirements | Inspection results, identification and use information |
Why does the workflow begin with part identification?
Two parts that look the same may have different base materials or processing histories. Existing damage to the body must be evaluated separately from surface renewal. Before the part information is clear, selecting a process solely by the desired color or commercial coating name is not sufficient.
The link between surface preparation and application
Surface preparation establishes the conditions for applying the subsequent layers. It is therefore a separate checkpoint in the workflow. However, the same abrasive, pressure or chemical is not used for every part. The stages in the diagram do not replace a processing specification for production personnel.
The number of layers, operations between coats and target thicknesses vary by system. More layers alone are not proof of a better result. Inspection must be based on the requirements of the specified system.
Information the visual workflow does not show
A brief diagram does not include processing times, temperature history or measurement results. These must be available in the relevant production and inspection records. The surface’s final appearance does not replace the required compliance documentation either; visual inspection and document review are different tasks.
Discussing your operation’s process
Prepare photos of the part, details of its operating environment and a description of the problem encountered. Specify which part of the workflow you want to discuss: acceptance criteria, suitability for recoating, inspection scope or use after delivery. This distinction allows the technical question to be evaluated within the correct scope.
