When requesting spare pans or coated equipment, specify whether you need a new part or plan to have an existing spare part coated. These are different requests with different scopes. Prepare your part information and contact Powerpan at +90 212 886 25 67.

Matching existing equipment

A spare part’s edge design, handling points, and intended application matter as much as its overall dimensions. Share the part code, dimensioned drawing, and photographs of the existing equipment, if available. Check whether measurements taken from a deformed part are a suitable reference for a new part.

Request informationDetails
Part descriptionPan, mold, or other equipment; include an existing code if available
Dimensions and geometryUnits, depth, cavity configuration, and attachment points
QuantityTotal required and any initial delivery requirement
CoatingExisting system or request for technical assessment
ApplicationProduction line, product, and operating conditions

How should spare quantities be planned?

There is no single spare percentage that applies to every business. Consider equipment undergoing maintenance, planned recoating batches, and the quantity that must remain in production together. Past loss or failure records and confirmed lead times can support planning.

Holding spares does not eliminate every risk of downtime. Their compatibility with the line, serviceable condition, and accessibility when needed also matter. If a different coating system will be used, do not assume its maintenance and process instructions are the same as those for existing equipment.

Quotation and supply conditions

Confirm during the discussion whether the requested part can be supplied, what the quotation will cover, and the current lead time. Do not assume an item is in stock simply because its name appears on this page. If existing spares are to be coated, their body and surface condition must be assessed before application.

Before and after delivery

Check the order description, quantities, coating scope, and delivery point in writing. On delivery, inspect for visible damage and confirm that the parts match the order. Verify line compatibility and the applicable instructions for use before putting them into production. For urgent requirements, state the date needed; do not build a firm schedule around it without confirmation.

Contact us for a project quotation

Tell us about your baking equipment or recoating requirements, including dimensions, quantities and operating conditions.